Meadows Primary School (DTEI/DECS)- Classrooms and Toilet Block
This project involved the design and construction of 4 purpose built classrooms 2 linked computer rooms, 2 associated kitchens and art rooms, shade structure, separate toilet block and a covered timber deck.
The design phase was conducted with input from both the School Council and Principal. |
|
Department of Transport, Energy & Infrastructure (SA) - Library
Design and construction of a library for the Pimpala Primary School. Our team worked closely with the school and its stake holders during the design and construction phase to ensure a building met the requirements of our client. Works were carefully planned to ensure the safety of the children still attending the school. The library was finished on time and within budget. |
|
Kangarilla Primary School - New classrooms
Demolition of an existing classroom building and construction of 2 new classrooms and refurbishment of 2 existing clasrooms. Works also included fencing and new fire tanks. |
|
more commercial projects...
Perilya Port Pirie
Work Carried out at Berth 6 Port Pirie. Works included the construction of a wheel washer, bund walls to an existing warehouse, structural footing systems for a loading facility and various concrete footings for new buildings.
Due to a tight schedule work were undertaken during christmas and new years. |
|
Bowmans SA
Construction of a 28m weighbridge and associated approach roads, structural footings for new grain silos & associated conveyor systems and other various concrete works. |
|
Karratha WA
Project Management of the civil works for a 20m weighbridge, approach ramps and automated driver control station. |
|
more civil projects...
29 Bartels Street Adelaide
Construction of 8, 3 level townhouses. Construction occurred on a tight site with limited access. The structure was consisted of tilt-up concrete wall panels |
|
Audrey Street, Ascot Park SA
Construction of 4, 2 storey dwellings. Dwellings were constructed of pre-cast concrete panels. |
|
Mary Street, Unley SA
Construction of 5 modern, 2 storey dwellings on a restricted site. Dwellings were constructed from finsihed and bagged brickwork, zincalume cladding and featured galvanised steel feature columns. |
|
more residential projects... |
|
 |
 |
 |
 |
|
 |
|
Trade: Various
Location: Plympton, SA
When: July 2011
Construction of 3 single storey brick veneer dwellings that has commenced in mid 2011. Various trades and suppliers required including: Bricklaying, Carpentry, Tiling, Roofing, Painting, Air Conditioning, Paving, Plasterboard etc
To submit your expression of interest to info@fusco.com.au
Applications close: Sunday 1st January 2012
Trade: Various
Location: Blackwood, SA
When: August 2011
Construction of 9 single storey brick veneer dwellings that has commenced in late 2011. Various trades and suppliers required including: Bricklaying, Carpentry, Tiling, Roofing, Painting, Air Conditioning, Paving, Plasterboard etc
To submit your expression of interest to info@fusco.com.au
Applications close: Sunday 1st January 2012
more... |
|
 |
 |
|
 |
 |
|
Concreter - finishers, laborers & steel fixers (sub-contract, SA & WA)
Role:
The work involves removing, forming, steel fixing, pouring and finishing concrete, driving a truck, and laying any size stormwater pipe. The work involves building and maintaining house pads, weighbridges, roads, footpaths, kerb and gutters, and drains.
Requirements: You must have experience in steel fixing, concrete finishing and constructing formwork. - OH&S green/white Card (Blue card for WA)
Desired Requirements: Be competant in the operation of backhoe and/or excavators - Plant operators license for excavator or backhoe
-
MR Truck Licence
more... |
|
 |
|