John Holland Rail - Office Fit Out, Young St Blackwood
Construction of offices for the Belair rail line upgrade support staff. Work had to be completed to a very short timeframe and involved night shifts, weekend and public holidays. It included the construction of a meeting room, multiple offices, lighting and the introduction of data and communication systems into a legacy building. |
|
Raw Fitness - Goodwood Rd, Colonel Light Gardens
Fit out of a boutique gymnasium including the construction of shower rooms, changing rooms and massage rooms into an existing building. The work was carried out to a tight time line. |
|
Long Distance Technologies, Welland SA
Long Distance Technolgies, Welland SA. - Demolition, fit out of existing
offices and construction of new offices and laboratories. Complete
modernization of the building to include new electrical re-wiring, lighting and
installation of data and communication lines. The work was commenced when scope, and design was not finalized and undertaken within a tight time frame. |
|
more commercial projects...
Blackwood, SA
Connection of power, water and sewer for site amenities, preparation of storage and parking area for John Holland Rail heavy equipment for the Belair rail line upgrade. A vacant site was transformed to accomodate site offices, first aid rooms, toilets and meeting rooms and a parking/storage area. Work included stripping of the top soil and compaction of the existing site. Addtional quarry rubble was introducted and compacted in layers to form an adequate base for heavy equipmeny movement and storage. Power, water and sewer was connected to temporary site huts, a covered walk area was built, including the construction of stairs, security lighting and fencing. |
|
Rockhampton, Queensland
Construction of a 28m weighbridge, approach and exit ramps. Work was undertaken on reclaimed land, a specialised heavy duty foundation was constructed. High strength, high cement content concrete was used due to the high corrosive environment. The project team overcame flash flooding to deliver the project on time and budget. |
|
Ellenbrook, WA
28m weighbridge and footings for site office at Rocla Quarry products Ellenbrook mine site. Construction included the removal of a existing bitumen driveway. |
|
more civil projects...
29 Bartels Street Adelaide
Construction of 8, 3 level townhouses. Construction occurred on a tight site with limited access. The structure was consisted of tilt-up concrete wall panels |
|
Audrey Street, Ascot Park SA
Construction of 4, 2 storey dwellings. Dwellings were constructed of pre-cast concrete panels. |
|
Mary Street, Unley SA
Construction of 5 modern, 2 storey dwellings on a restricted site. Dwellings were constructed from finsihed and bagged brickwork, zincalume cladding and featured galvanised steel feature columns. |
|
more residential projects... |
|
 |
 |
 |
 |
|
 |
|
Trade: Roofing
Location: Plympton, SA
When: February 2009
Construction of roof cladding for 3 units.
Only top quality trades people need apply.
Applications close: Sunday 10th May 2009
Trade: Carpentary
Location: Plympton, SA
When: March 2009
Construction of timber frame for a 3 unit complex.
Only top quality trades people need apply.
Applications close: Tuesday 31st March 2009
more... |
|
 |
 |
|
 |
 |
|
Concreter - finishers, laborers & steel fixers (sub-contract, SA & WA)
Role:
The work involves removing, forming, steel fixing, pouring and finishing concrete, driving a truck, and laying any size stormwater pipe. The work involves building and maintaining house pads, weighbridges, roads, footpaths, kerb and gutters, and drains.
Requirements: You must have experience in steel fixing, concrete finishing and constructing formwork. - OH&S green/white Card (Blue card for WA)
Desired Requirements: Be competant in the operation of backhoe and/or excavators - Plant operators license for excavator or backhoe
-
MR Truck Licence
more... |
|
 |
|